Listing verified: Aug 2026 · availability and prices confirmed with the developer before presentation.
This development is planned in Torre del Mar as a larger residential complex with substantial landscaped areas and a saltwater swimming pool. Developer-supplied material also refers to 24-hour monitoring and an expected completion in the second half of 2027. Unlike a small central apartment building, the project is therefore designed around life within the development and the use of shared outdoor space, rather than relying only on its address.
For that reason, no unsupported walking times or metre measurements have been added.
The scale and communal programme suggest a product suitable both as a second home and for permanent living for buyers who prefer a larger residential community and recreational grounds to a small urban block. The second-half-of-2027 date currently positions it as a purchase during the development stage. The landscaped grounds and 24-hour monitoring reinforce the profile of a development designed for regular use rather than short holiday stays alone. For families and longer-term residents, the shared outdoor environment provides additional everyday space without relying solely on the town or beach for recreation.
The exact payment schedule depends on the developer — we present it with the contract at the offer presentation.
Approximate location — the exact address is shared on request.
In the same area and a similar budget